Hello,
I wanted to send a note out to the communities on sync new designs into a Project. Currently we have a Master Logic Bookshelf and a project for each vehicle platform. We currently exported the designs out of the Master logic design bookshelf on 1/10/2015. Our design team has updated logics and I want to "Copy Advance" the new logics into our Project for the vehicle platform.
When the logic updates are created and copied I am running into a couple different issues.
- Conductors nets that are shared aren't being sync over back into the logic once copied into the new project. Example: J1939 multicore nets are not attached to the existing J1939 shared nets in Platform project.
- Tried a different method of copying the logics. I checked the "Overwrite" box. When the export happens it fails with the message: Copy Design Failed. Selected designs cannot be copied in overwrite mode.
I wanted to see if there was a process or recommendation that people had.